I could have done better if I __________ more time.

lk2025-05-16  1

题目:I could have done better if I __________ more time.

A. have had

B. had

C. had had

D. will have had

答案:评论后可见此内容

本站资源均来自互联网,侵权请联系站长删除

随机主题
价差预备费,是指概算编制年至工程开工时止这段时间因物价上涨所增加的费用。( )地质条件较好时,无压隧洞可采用圆拱直墙形。( )水闸和土坝中的铺盖是一种( )措施。以粉煤灰取代部分水泥或集料,都能在保持混凝土原有和易性条件下减少( )。在研究衍射时,可按光源和所研究的点到障碍物的距离,将衍射分为菲涅耳衍射和夫琅禾费衍射两类,其中夫琅禾费衍射为车细长轴时,应选择较低切削速度。精车1Cr18NiTi奥氏体不锈钢可采用的硬质合金刀片是()。相邻两牙在()线上对应两点之间的轴线距离,称为螺距。It is pretty well understood _______controls the flow of carbon dioxide in and out the atmosphere today.My suggestion was that the meeting __________ off till next week. (put)What’s the difference in the role of the lead guitar and the rhythm guitar?可能坠落范围半径可以确定不同高处作业时( )。下列选项中属于奥苏伯尔三类意义学习的是( )。某净化装置,进口气体流量为5.5m3s,污染物浓度为750mgm3,装置出口气体流量为5.1m3s,污染物浓度为50mgm3。则该装置的净化效率为()下列措施中不能达到提高重力沉降室效率的是( )在载气流速比较高时,分子扩散成为影响柱效的主要因素。根据《环境噪声污染防治法》的规定,谁可以根据国家声环境质量标准,划定本行政区域内各类噪声环境质量标准的适用区域 (  )建筑物内塑料给水管敷设哪一条是错误的?( )在我国室内集体宿舍生活给水管网设计水流量的计算中,若计算出的流量小于该管段的一个最大卫生器具的给水额定流量时,应以该管段上的哪些参数作为设计秒流量。( )以下那次战役不是国民党政府组织的()。
最新回复(0)
公众号图片
🔥推荐

推荐使用我们的公众号搜索题目,题目更全,检索更方便。支持语音、图片、文字等多种搜索方式。